The new $6.4 billion dollar Bay Bridge between Oakland and San Francisco, originally scheduled to open in a few weeks, is now scheduled to open in December. The delay caused by some failed bolts that ... more 
The new $6.4 billion dollar Bay Bridge between Oakland and San Francisco, originally scheduled to open in a few weeks, is now scheduled to open in December. The delay caused by some failed bolts that required retrofitting. (Aug. 7) less 
1 / 29
Associated Press Videos
Wed, Aug 7, 2013 3:23 AM EDT