A miner stands in front of the drill machine 'Sissi' after it broke through the rock at the final section Faido-Sedrun, at the construction site of the NEAT Gotthard Base Tunnel October 15, 2010. With... more 
A miner stands in front of the drill machine 'Sissi' after it broke through the rock at the final section Faido-Sedrun, at the construction site of the NEAT Gotthard Base Tunnel October 15, 2010. With a length of 57 km (35 miles) crossing the Alps, the world's longest train tunnel should become operational at the end of 2017. REUTERS/Christian Hartmann (SWITZERLAND - Tags: TRANSPORT BUSINESS BUSINESS CONSTRUCTION POLITICS IMAGE OF THE DAY TOP PICTURE) FOR BEST QUALITY IMAGE SEE: GM1E6CG0XUC01 - RTXTGU6 less 
1 / 10
Yahoo News | Photo By REUTERS
Wed, Apr 3, 2013 12:00 PM EDT